Lab 02 / Five sources · three buses
Two utility infeeds, synchronous DG, solar DG and BESS. Inspect power flow, faults, and the currents each relay actually sees.
PresetAll five online
PresetDER offline
PresetBESS charging
PresetUtility B offline
Each preset starts from the default network. Faults are applied at U · Utility, P · Plant, or F · DER. Source labels are solved MW injection; negative means absorption. The same ideal CT ratio is applied at both displayed relay locations. Positive BESS MW discharges; negative MW charges. Duration uses constant scheduled AC power, present state of charge and the entered one-way efficiency. It excludes auxiliaries, temperature, degradation and voltage-dependent limits.
Three-bus complex nodal equations with constant-PQ loads and solar/BESS injections. Two utility equivalents and one synchronous DG are voltage sources behind impedances. A damped Newton method solves six real current-balance equations. Results include convergence residuals and a complex power-balance check. Generator excitation, governors and reactive limits are not simulated. Scheduled inverter P/Q is held constant; low-voltage operation may exceed rated current and is flagged rather than silently clamped.
Positive, negative and zero-sequence admittance matrices are formed independently. The solver obtains the selected bus driving-point impedances, connects the sequence networks for ABC, A–G, B–C or B–C–G, then reconstructs bus voltages and branch currents. Loads are omitted from the fault model. Conventional-source internal EMFs remain at their entered values. Fixed positive-sequence inverter fault injections use their rated current multiplier and angle relative to pre-fault local voltage. The fault-network open-circuit voltage is recalculated; it is not the loaded pre-fault voltage.
T1 has a real off-nominal ratio a = 1 + tap × step/100 at the U end. Yff = y/a², Yft = Ytf = −y/a and Ytt = y. Increasing a reduces the ideal downstream voltage for a fixed upstream voltage; other infeeds alter the system response. BESS state of charge is a static energy calculation. Tap search is a static sweep, not a dynamic OLTC. Grid-following DER alone cannot establish an island voltage; unsupported islands are rejected.
All quantities are steady RMS fundamental-frequency phasors. One common three-phase MVA base and nominal line-to-line kV base apply throughout: Zbase = kV²/MVA and Ibase = MVA × 1,000 / (√3 × kV). Changing the base without rebasing entered per-unit values changes the physical network. The same fixed source Thevenin impedance is used in power flow and the fault network. Source Z₂ = Z₁. Source Z₀ and branch Z₀ use the entered multipliers. All conventional sources have a grounded zero-sequence path. Solar and BESS have no independent negative or zero-sequence injection in this model. There is no load unbalance, harmonics, electromagnetic transients, motor starting, dynamic stability, inverter control model, arc-flash calculation or multi-terminal protection logic. Switches remove paths algebraically; they do not model interrupting duty.
The single-source case you can solve by hand, and check, is Bus fault lab. This five-source study is the specification above: Newton power flow, sequence faults, tap sweep and storage energy. Educational results still need an appropriate model and a review before any real equipment decision.
Learn it
With several infeeds (utility, synchronous DG, inverter-based solar and BESS), the fault current at any point is the sum of every source's contribution. Each relay sees only the part that flows through its own CT.
Inverter-based sources are current-limited to about 1.1 to 1.5 pu, so taking them offline barely changes the fault level, while losing a utility infeed changes it a lot.
Quiz · 0/2
1. Why does taking solar offline barely change the bus fault current?
2. Infeed from a second source at the remote bus makes a distance relay…