Power Systems Lab · 18 modules · all computed in your browser
Per-unit & vector groups
Bases at 115/230/500 kV, rebasing, Dyn1/Dyn11 shifts.
Loading module…
Power Systems Lab · 18 modules · all computed in your browser
Bases at 115/230/500 kV, rebasing, Dyn1/Dyn11 shifts.
Loading module…
Per-unit calculator
Z_base
529.00 Ω
I_base
251.0 A
Z in pu
0.0500 pu
Z_pu = Z_Ω / Z_base
Xt on system base
0.0400 pu
Nameplate impedance is on the transformer’s own MVA. Rebase before adding it to the system.
Transformer vector groups · IEC clock notation
Clock number
1 → 30°
LV vs HV (pos. seq.)
lags 30°
Zero sequence: Blocked HV↔LV; delta circulates I0, LV neutral provides ground source
Negative-sequence quantities shift by the opposite angle. That is why an LV fault looks different on HV-side relays.
Learn it
Per-unit expresses every quantity as a fraction of a chosen base, so a 500 kV line and a 13.8 kV feeder can be added in one network. Transformers effectively disappear: with bases related by the turns ratio, a transformer becomes just its leakage impedance.
Vector groups describe how the winding connections rotate the LV phasors relative to HV. Differential relays must undo that rotation, and remove zero-sequence current, before comparing the two sides.
Quiz · 0/3
1. Z_base for 500 kV on a 100 MVA base is…
2. In Dyn11 the LV positive-sequence voltage…
3. Why does a transformer differential remove zero-sequence current from the wye side?